Feature #12013

Publish a call for testing the revamped Greeter

Added by alant 2016-12-02 23:26:24 . Updated 2016-12-06 19:00:00 .

Status:
Resolved
Priority:
Normal
Assignee:
Category:
Target version:
Start date:
2016-12-02
Due date:
% Done:

100%

Starter:
Affected tool:
Deliverable for:

Description

It would be nice to have testing feedback before the next spring. I wrote a draft in https://tails.boum.org/blueprint/greeter_revamp_UI/test_greeter_1.0.0-alpha/, that should be reviewed and published.


Subtasks


History

#1 Updated by intrigeri 2016-12-03 08:31:50

  • Assignee changed from intrigeri to sajolida
  • Target version set to Tails_2.9.1
  • QA Check set to Info Needed

hi sajolida! I’d like to polish and publish this call for testing. I see it as a way to 1. gather feedback before we include the new Greeter in Tails 3.0~beta1 (scheduled for Dec ~23), and 2. show that we’re doing good job + call for donations. But I want to coordinate with other blog posts (2.9 release, fundraising drive, November report). So, when would be a good time for me to publish this blog post?

#2 Updated by sajolida 2016-12-03 19:09:02

  • Assignee changed from sajolida to intrigeri
  • QA Check deleted (Info Needed)

Thanks for taking this into account. The calendar I envisioned so far was like this:

  - <2016-11-26 Sat> roadmap
  - <2016-12-09 Fri> monthly report
  - <2016-12-13 Tue> release 2.9
  - <2016-12-19 Mon> mediapart
  - <2016-12-27 Tue> thank you + 33C3

I still plan on doing two posts for December and would like to both spread them as much as possible and have them as visible as possible on /home. The mediapart post is ready (it needs translation but I’ll call for that tomorrow probably).

So actually, if you want to publish it very soon (on Sunday or Monday) then it could be on top for one week and I wouldn’t have to change my calendar :)

#3 Updated by intrigeri 2016-12-05 19:39:59

  • Subject changed from Publish call for testing greeter alpha to Publish a call for testing the revamped Greeter
  • Status changed from Confirmed to In Progress
  • % Done changed from 0 to 10

#4 Updated by intrigeri 2016-12-05 19:40:11

  • Type of work changed from Promote to Communicate

#5 Updated by intrigeri 2016-12-06 18:29:09

  • Blueprint changed from https://tails.boum.org/blueprint/greeter_revamp_UI/test_greeter_1.0.0-alpha/ to https://tails.boum.org/blueprint/greeter_revamp_UI/test_redesigned_Tails_Greeter/

#6 Updated by intrigeri 2016-12-06 19:00:01

  • Status changed from In Progress to Resolved
  • Assignee deleted (intrigeri)
  • % Done changed from 10 to 100

It’s now live! https://tails.boum.org/news/test_redesigned_Tails_Greeter/